design services

this audit strategies is going for :
1. Quality control over auxiliary configuration process.
2. Improve execution
3. Provide validity
4. Suitability of auxiliary configuration viewpoints
5. As a database for consistence and institutionalization.
6. To detect each mix-up or blemish in the outline system.
7. Provide capable outline advancement.
The accompanying field of configuration administrations we are giving:
• Static Outline of structures
• Dynamic Outline of structures
• Retrofitting of existing building and structures
• 3D systematic demonstrating
• Deep and shallow establishment
• Steel structure outline
• Reinforced solid structures
• High rise structures
• Post tensioned and pre-thrown solid structures
• Steel structure plan for single and multi-story building